The team at BK designed the scheme and then took it from a greenfield site to fully operational in just 8 weeks, between June and the harvest. What’s more, the project also included an adjacent machinery store that links all existing stores, now operating with the same machinery to 5 stores.
On the site, we installed a brand new 150tph drying facility with 900 tonne storage capacity. This included:
The project also included the manufacture of a 60 tonne below ground intake pit, fabricated by the customer from drawings supplied by BK.