The latest project includes a 23,500 tonne store with 120 tonne per hour intake from two intake bays. There is also a 56 tph dryer and 100 tph pre-cleaner. We have also installed a workshop and chemical store, laboratory facilities and other buildings at the former greenfield site.
However, BK has also designed and installed many other projects at the Great Tew Estate, including a new 12,000 tonne store that included:
In addition, our in-house team fabricated a 30 tonne capacity intake pit and all electrical work was undertaken by BK, reinforcing our ability to project manage a complete project from start to finish, ensuring that we always deliver the required solution on time.