Great Tew Estate

At the Great Tew Estate in Chipping Norton, BK has built over the past 8 years 5 turnkey stores with a combined capacity of 57,500 tonnes.

The latest project includes a 23,500 tonne store with 120 tonne per hour intake from two intake bays. There is also a 56 tph dryer and 100 tph pre-cleaner. We have also installed a workshop and chemical store, laboratory facilities and other buildings at the former greenfield site.

However, BK has also designed and installed many other projects at the Great Tew Estate, including a new 12,000 tonne store that included:

  • 120 tph intake and pre-cleaning
  • 80 tph dryer
  • 100 tph Cimbria cleaner
  • 80 tph Handling Machinery from dryer to store
  • Automatic sampler
  • Computerised Temperature Monitoring

In addition, our in-house team fabricated a 30 tonne capacity intake pit and all electrical work was undertaken by BK, reinforcing our ability to project manage a complete project from start to finish, ensuring that we always deliver the required solution on time.

Bill Bird, Managing Director - BK Grain

Providing quality servicing is a vital tool in BK Grain's armoury. Many of the farmers who are now commissioning new stores or drying equipment came to us as people who originally wanted something serviced or mending. We have a high proportion of returning customers, which is a sure sign that we must be doing things right for our customers.